Post-Construction Stormwater Management

Post-Construction Stormwater Management

Minimum Control Measure (MCM) #5 of the Stormwater Management Plan

The purpose of this MCM is to ensure the quality of water leaving a previously completed construction site remains continuously treated prior to leaving the property. With the implementation of specifically required Stormwater Treatment Facilities (STFs) the quality of water will have the best chance of remaining clean prior to entering the receiving waters of the state (Platte and Wood Rivers).

SEDIMENT FOREBAY
Rain Garden
Bioswale

Leave a Reply