Construction Stormwater Management

Construction Stormwater Management

Minimum Control Measure (MCM) #4 of the Stormwater Management Plan

The purpose of this MCM is to reduce pollutants in stormwater runoff from construction activities that result in land disturbance. An Erosion and Sediment Control program is being followed and an ordinance has been enacted within the City Code. Design standards meeting the Nebraska Department of Environmental Quality (NDEQ) and the National Pollution Discharge Elimination System (NPDES) Permit requirements are available on the City website. There are Erosion and Sediment Control best management practices (BMPs) for a construction site no matter what the size. 

Leave a Reply